Removing Processors; Preliminary Steps; Removing A Processor - Fujitsu PRIMERGY RX300 S8 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX300 S8:
Table of Contents

Advertisement

11.3

Removing processors

Upgrade and Repair Unit
(URU)
Tool:
Phillips PH2 / (+) No. 2 screw driver

11.3.1 Preliminary steps

"Disabling BitLocker functionality" on page 73
Ê
"Disabling SVOM boot watchdog functionality" on page 74
Ê
"Shutting down the server" on page 54
Ê
"Disconnecting power cords" on page 54
Ê
"Getting access to the component" on page 57
Ê
"Removing processor heat sinks" on page 291
Ê

11.3.2 Removing a processor

I
This description applies to the following procedures:
– Removing CPU 2 from a dual-processor configuration
– Removing CPUs from a defective system board (see section
"Swapping processors" on page
Ê Remove the desired processor heat sink as described in section
processor heat sinks" on page
RX300 S8
291.
Upgrade and Maintenance Manual
Hardware: 15 minutes
Software: 5 minutes
438)
Processors
"Removing
273

Advertisement

Table of Contents
loading

Table of Contents