Isuzu 1999 RODEO Workshop Manual page 222

Rodeo 1999
Hide thumbs Also See for 1999 RODEO:
Table of Contents

Advertisement

12. Install adjust shim.
1. Attach the side bearing to the differential
assembly without shims. Support the opposite
side using a pilot to prevent bearing damage.
Legend
(1) Drive handle:J–8092
(2) Installer:J–24244
(3) Pilot:J–8107–2
2. Insert the differential cage assembly with bearing
outer races into the side bearing bores of the
carrier.
DIFFERENTIAL (FRONT)
3. Using two sets of feeler gauges, insert a feeler
stock of sufficient thickness between each
bearing outer race and the carrier to remove all
end play. Make certain the feeler stock is pushed
to the bottom of the bearing bores.
Mount the dial indicator J–8001 on the carrier so
that the indicator stem is at right angles to a tooth
on the ring gear.
425RS029
4. Adjust feeler gauge thickness from side to side
until ring gear backlash is in the specified range.
Backlash: 0.13–0.20 mm(0.005 –0.008 in)
With zero end play and correct backlash estab-
425RS030
lished, remove the feeler gauge packs, determine
the thickness of the shims required and add 0.025
mm (0.001 in) to each shim pack to provide side
bearing preload. Always use new shims.
4A1–15
425RS031
425RS032

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents