Preparing For T1600 Router Installation; T1600 Site Preparation Requirements Checklist - Juniper T1600 Hardware Manual

Core router
Hide thumbs Also See for T1600:
Table of Contents

Advertisement

CHAPTER 5

Preparing for T1600 Router Installation

T1600 Site Preparation Requirements Checklist

Table 25: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed router
tolerances.
Power
Measure distance between external power
sources and router installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Rack
Verify that your rack meets the minimum
requirements for the installation of the router.
Plan rack location, including required space
clearances.
Copyright © 2010, Juniper Networks, Inc.
T1600 Site Preparation Requirements Checklist on page 75
Rack Requirements for the T1600 Router on page 76
Clearance Requirements for Airflow and T1600 Hardware Maintenance on page 77
The checklist in Table 25 on page 75 summarizes the tasks you need to perform when
preparing a site for router installation.
For More Information
"T1600 Environmental
Specifications" on page 347
"T1600 DC Power Distribution" on
page 355
"T1600 Chassis Grounding Cable and
Lug Specifications" on page 362
"T1600 AC Power Requirements" on
page 358
"T1600 DC Power Requirements" on
page 352
"Rack Requirements for the T1600
Router" on page 76
"Clearance Requirements for Airflow
and T1600 Hardware Maintenance"
on page 77
Performed By
Date
75