Chapter 3

Preparing the Site for Router Installation

Site Preparation Checklist

Table 19: Site Preparation Checklist

Item or Task
Verify that environmental factors such as
temperature and humidity do not exceed router
tolerances.
Select the type of rack or cabinet.
Plan rack or cabinet location, including required
space clearances.
If a rack is used, secure rack to floor and
building structure.
Acquire cables and connectors.
Locate sites for connection of system
grounding.
Measure distance between external power
sources and router installation site.
This chapter describes how to prepare your site for installation of the MX240 router.
It discusses the following topics:
Site Preparation Checklist on page 29
Cabinet Requirements on page 30
Rack Requirements on page 31
Clearance Requirements for Airflow and Hardware Maintenance on page 32
The checklist in Table 19 on page 29 summarizes the tasks you must perform when
preparing a site for router installation.
For More Information
"Router Environmental
Specifications" on page 163
"Cabinet Requirements" on page 30,
"Rack Requirements" on page 31
"Cabinet Size and Clearance
Requirements" on page 30,
"Rack Size and Strength" on page 31,
"Clearance Requirements for Airflow
and Hardware
Maintenance" on page 32
"Connection to Building
Structure" on page 32
"Chassis Grounding
Specifications" on page 165
Performed By
Date
Site Preparation Checklist
29