Supplies - Juniper T1600 Hardware Manual

Core router
Hide thumbs Also See for T1600:
Table of Contents

Advertisement

T1600 Core Router Hardware Guide
Related
Documentation
Connecting AC Power to a T1600 Router with Three-Phase Wye AC Power Supplies
140
T1600 Three-Phase Delta and Wye AC Power Supply Overview on page 65
Powering On the AC-Powered T1600 Router on page 142
T1600 AC Power Electrical Safety Guidelines on page 339
T1600 AC Power Cord Specifications on page 360
T1600 Preventing Electrostatic Discharge Damage on page 312
To connect an AC power cord:
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
1.
the strap to an approved site ESD grounding point. See the instructions for your site.
Switch off the customer site circuit breakers. Ensure that the voltage across the AC
2.
power source is 0 V and that there is no chance that the voltage might become active
during installation.
Detach the ESD grounding strap from the approved site ESD grounding point, and
3.
connect the strap to one of the ESD points on the chassis.
Switch the power switch on the power supply faceplate to the standby position.
4.
Using a number 2 Phillips (+) screwdriver, loosen the two captive screws on the metal
5.
AC wiring compartment.
Open the metal door of the metal AC wiring compartment.
6.
Unscrew the retaining nut from the AC power cord.
7.
Place the retaining nut inside the metal wiring compartment.
8.
Put the wires of the AC power cord through the hole of the metal wiring compartment.
9.
Screw the retaining nut onto the AC power cord to secure it to the metal wiring
10.
compartment.
Copyright © 2010, Juniper Networks, Inc.

Advertisement

Table of Contents
loading

Table of Contents