Juniper T1600 Hardware Manual page 305

Core router
Hide thumbs Also See for T1600:
Table of Contents

Advertisement

Copyright © 2010, Juniper Networks, Inc.
NOTE: After powering off a power supply, wait at least 60 seconds before
turning it back on.
Remove the ESD grounding strap from the ESD point on the chassis, and attach it to
4.
an approved site ESD grounding point. See the instructions for your site.
Disconnect the AC power cord (see Figure 164 on page 281) from the power source.
5.
Figure 164: Three-Phase Delta AC Power Supply
Remove the ESD grounding strap from the approved site ESD grounding point. See
6.
the instructions for your site. Reconnect the strap to one of the ESD points on the
chassis.
Using a number 2 Phillips (+) screwdriver, loosen the two screws on the door of the
7.
metal wiring compartment that protects the AC terminal block.
Open the door of the metal wiring compartment.
8.
Chapter 17: Replacing T1600 Router Hardware Components
281

Advertisement

Table of Contents
loading

Table of Contents