Removing The T1600 Scgs - Juniper T1600 Hardware Manual

Core router
Hide thumbs Also See for T1600:
Table of Contents

Advertisement

Removing the T1600 SCGs

Copyright © 2010, Juniper Networks, Inc.
Place one hand underneath the control board to support it and slide it completely out
6.
of the chassis. Place it on the antistatic mat.
CAUTION: Do not stack hardware components on one another after you
remove them. Place each component on an antistatic mat resting on a
stable, flat surface.
Repeat the procedure for the second control board.
7.
Figure 66: Removing a Control Board
The router can have one or two SCGs installed. The SCGs are located in the upper rear
of the chassis, above the control boards and Routing Engines. Each SCG weighs
approximately 1.9 lb (0.9 kg).
To remove the SCGs (see Figure 67 on page 108):
Place an electrostatic bag or antistatic mat on a flat, stable surface.
1.
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
2.
the strap to an approved site ESD grounding point. See the instructions for your site..
Loosen the captive screws on the edges of the SCG faceplate.
3.
Grasp the SCG by the handle on the faceplate and slide it out of the chassis.
4.
Place the SCG on the antistatic mat.
5.
Repeat the procedure for the second SCG.
6.
Chapter 10: Installing the T1600 Router Without a Mechanical Lift
107

Advertisement

Table of Contents
loading

Table of Contents