ABB IRB 6620 Product Manual page 220

Hide thumbs Also See for IRB 6620:
Table of Contents

Advertisement

4 Repair
4.4.3 Replacement of the upper arm
Continued
8
9
10
11
Refitting
The procedure below details how to refit the upper arm.
1
2
Continues on next page
220
Action
Remove the three metal clamps securing
the cable harness on the lower arm and
armhouse.
Remove motor, axis 3.
Remove the attachment screws securing
the upper arm to the gearbox axis 3.
Note! Do not forget to remove the four
screws inside the hole in the lower arm.
Remove the complete upper arm and put it
on the floor. Let the upper arm lean on its
side.
Action
Make sure the o-ring is fitted to the gearbox.
Lightly lubricate the o-ring with grease.
CAUTION
The complete upper arm (incl. gearbox axis
3) weighs 282 kg without any additional
equipment fitted! Use a suitable lifting
device to avoid injury to personnel!
© Copyright 2006-2020 ABB. All rights reserved.
Note
xx0600003083
A: Metal clamp, lower arm (2 pcs)
B: Metal clamp, gearbox axis 3
C: Metal clamp, armhouse
Detailed in the section
Replacement of
motor, axis 3 on page
248.
Shown in the figure
Location of the upper
arm on page
217.
Note
Product manual - IRB 6620
3HAC027151-001 Revision: W

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents