ABB IRB 6620 Product Manual page 200

Hide thumbs Also See for IRB 6620:
Table of Contents

Advertisement

4 Repair
4.3.3 Replacement of complete arm system
Continued
4
5
6
7
8
9
Continues on next page
200
Action
Fit the lifting accessory and ad-
just it as detailed in the enclosed
instructions.
Also fit a hoisting block to the
front, used to adjust the balance
of the arm system in order to lift
it completely level.
Note
There is an alternate method of
lifting the complete armsystem
described below.
DANGER
Turn off all:
electric power supply to
the robot
hydraulic pressure supply
to the robot
air pressure supply to the
robot
Before entering the robot work-
ing area.
Drain the oil from gearbox axis
1.
Disconnect the cabling in the
rear of the robot base and re-
move the cable support plate in-
side the base.
Pull the disconnected cabling up
through the center of the axis-1
gearbox.
Remove the motor, axis 1.
© Copyright 2006-2020 ABB. All rights reserved.
Note
Art. no. is specified in
Required equipment on page
Make sure the lift is done completely level! How to
adjust the lift is described in the enclosed instruction
to the lifting accessory! Read the instructions before
lifting!
xx0600003101
A : Lifting tool
B : Roundsling
C : Lifting chain
D : Hoisting block
Detailed in section
Changing oil, axis-1 gearbox on
page
147.
How to replace the cabling is detailed in
of cable harness, lower end (axes 1-2) on page
Detailed in section
Replacement of motor, axis 1 on
page
237.
197.
Replacement
180.
Product manual - IRB 6620
3HAC027151-001 Revision: W

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents