ABB IRB 6620 Product Manual page 165

Hide thumbs Also See for IRB 6620:
Table of Contents

Advertisement

D1
D2
E
F
G
H
Required equipment
Equipment, etc.
Battery pack
Standard toolkit
Circuit diagram
Removing, battery
Use this procedure to remove the SMB battery.
1
2
Product manual - IRB 6620
3HAC027151-001 Revision: W
Battery pack (2-pole battery contact)
Battery pack (3-pole battery contact)
SMB/BU box
Connection point, battery cable
SMB (Serial measurement board)
BU unit (Brake release unit)
Note
There are two variants of SMB units and batteries. One with 2-pole battery contact
and one with 3-pole battery contact. The variant with the 3-pole battery contact
has longer lifetime for the battery.
It is important that the SMB unit uses the correct battery. Make sure to order the
correct spare parts. Do not replace the battery contact!
Spare part no.
For spare part no.
see:
-
-
Action
Move the robot to its calibration position.
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot working area.
© Copyright 2006-2020 ABB. All rights reserved.
Note
Battery includes protection circuits. Only re-
place with a specified spare part or an ABB-
Spare part
approved equivalent.
lists on
page 345
Content is defined in section
on page
See chapter
3 Maintenance
3.4.8 Replacing the SMB battery
Continued
Standard tools
340.
Circuit diagram on page
Note
This is done in order to facilitate
updating of the revolution counter.
Continues on next page
347.
165

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents