ABB IRB 6620 Product Manual page 206

Hide thumbs Also See for IRB 6620:
Table of Contents

Advertisement

4 Repair
4.3.3 Replacement of complete arm system
Continued
9
10
11
12
13
14
Continues on next page
206
Action
Look through the empty mounting hole of
motor 1 to assist in aligning the assembly
during refitting of the arm system.
Lower the arm system with guidance from
the guide pins previously fitted to the axis-
1 gearbox axis 1. Fit the guide pins in the
corresponding holes in the frame as shown
in the figure to the right.
Note
The refitting must be made completely level!
Make sure the lifting accessory is adjusted
prior to refitting of arm system.
Remove the guide pins and secure the arm
system to the base with its 16 attachment
screws and washers.
Refit the axis-1 motor.
Perform a leak-down test of the axis-1
gearbox.
Refit the cabling in the base.
Refill the gearbox with lubricating oil.
© Copyright 2006-2020 ABB. All rights reserved.
Note
This is a complex task to be performed
with utmost care in order to avoid injury
or damage!
Use a crank to turn the gearbox in order
to find the right position for the holes.
xx0600003094
A : Holes in frame for guide pins,
shown from below.
xx0600003093
A : Holes in frame for guide pins,
shown from above.
Shown in the figure
Location of arm sys-
tem on page
197.
M12 x 80, 12.9 quality gleitmo. Tightening
torque: 105 Nm.
Reused screws may be used, providing
they are lubricated as detailed in section
Screw joints on page 336
Detailed in section
Performing a leak-
down test on page
172.
Detailed in section
Replacement of cable
harness, lower end (axes 1-2) on page
Detailed in section
Changing oil, axis-1
gearbox on page
147.
Product manual - IRB 6620
3HAC027151-001 Revision: W
before fitting.
180.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents