Action
Reconnect the battery cable to the SMB battery
pack and secure it with the velcro strap.
Put the SMB/BU unit back into the box and secure
it with its attachment screws.
Update the revolution counter.
DANGER
Make sure all safety requirements are met when
performing the first test run.
© Copyright 2006-2020 ABB. All rights reserved.
3 Maintenance
3.4.8 Replacing the SMB battery
Continued
Note
Art. no. is specified in
Required
equipment on page
165.
Shown in figure
Location of SMB
battery on page
164.
Shown in figure
Location of SMB
battery on page
164.
Detailed in chapter Calibration -
section
Updating revolution coun-
ters on page
307.