Avaya DEFINITY Server R Manual page 262

Upgrades and additions
Hide thumbs Also See for DEFINITY Server R:
Table of Contents

Advertisement

Upgrading a Multicarrier G2 Universal Module to Avaya
DEFINITY Server R EPN running Avaya Communication
Manager
9. Disconnect and remove the ICC cables. See
reused.
10. Remove the fan trim plate by pulling it straight off.
11. Clean or replace the air filter (403326820) if necessary.
12. In front of carrier, remove the 4 screws (top 2 first) holding the "B" carrier to
the cabinet frame. Use a long-handle screwdriver or 5/16-inch socket with
a 10-inch extension.
13. Behind the carrier, remove the 2 screws holding the "B" carrier's rear
connector panel to the cabinet frame.
14. Slide the carrier forward 1 to 2 inches; then, from the back, be sure that no
cables or wiring harnesses are caught on the cabinet/carrier framework.
!
CAUTION:
Cables and wiring harnesses can be damaged if they catch on the
framework and if too much pressure is applied in removing the carrier.
15. Remove the carrier by sliding it out the front of the cabinet.
16. Repeat Steps 12 through 15 for the "A" carrier.
17. On port carrier J58890BB-1, connect the TDM cable or the TDM terminator
to Slot 02. On port carriers J58890BB-2 and J58890BB-3, connect the
TDM cables or the TDM terminator to Slot 01. If the port carrier has
J58890BB-1 and J58890BB-2 printed on it, treat it as a J58890BB-1.
5-72
Issue 7 November 2003
Figure
5-10. They will not be
555-233-115

Advertisement

Table of Contents
loading

Table of Contents