Avaya DEFINITY Server R Manual page 242

Upgrades and additions
Hide thumbs Also See for DEFINITY Server R:
Table of Contents

Advertisement

Upgrading a Multicarrier G2 Universal Module to Avaya
DEFINITY Server R EPN running Avaya Communication
Manager
Table 5-13. TDM/LAN Connections
"J" Number
J58890BB-1
J58890BB-2
J58890BB-3
J58890AF
12. Install the front trim plate on the "A" carrier.
13. Install the power units (removed from G2 module control carrier) into the
"A" carrier. Do not interchange the physical locations of the units. The
631AR1, 631WA1, 631DA1, or 644A install in the left side, while the
631BR1, 631WB1, 631DB1, or 645B install in the right side.
NOTE:
In most cases, the new carrier will contain the same power supplies
as in the existing system. However, the new carrier may contain a
649A Power Unit. If so, use the power units from the G2 power
module.
14. If the expansion control carrier contains a 631BR1, 631WB1, or 645B
power unit, install the previously removed TN736 power unit in port slots
"18" and "19" of the carrier (adjacent to the 631BR1, 631WB1, or 645B). If
the system is equipped for neon message waiting, a TN752 or TN755
power unit must be used.
NOTE:
The TN736 is not required when the 631DB1 or 645B power unit is
used in the J58890AH control carrier or the J58890BB-2 or
J58890BB-3 port carriers. It is required in the J58890BB-1 port
carrier, regardless of which 631 power unit is provided. Use the
TN752 or TN755 if the system is equipped with neon message
waiting.
15. Connect the white power cords to the power units.
5-52
Issue 7 November 2003
Carrier Type
Port
Port
Port
EPN Control "A"
LHS Slot
RHS Slot
21
02
21
01
21
01
21
02
555-233-115

Advertisement

Table of Contents
loading

Table of Contents