Dismantle SCC PPN
Dismantle SCC PPN
Check SPE
1. Type status system 1 and press
Disable Scheduled Maintenance and Alarm
Origination to INADS
1. To prevent scheduled daily maintenance from interfering with the update or
upgrade, type change system-parameters maintenance and press
2. If scheduled maintenance has begun, set the Stop Time field to 1 minute
after the current time.
or
If scheduled maintenance has not begun, set the Start Time field to a
time after the upgrade is completed. For example, if you start the upgrade
at 8:00 p.m. and the upgrade takes 90 minutes, set the Start Time field
to 21:30.
!
CAUTION:
If you do not disable Alarm Origination, the system may generate
alarms, resulting in unnecessary trouble tickets.
3. Type neither in the Alarm Origination to OSS Numbers field and
press
NOTE:
For some software loads, set the Alarm Origination
Activated field to n and set the Cleared Alarm Notification
and Restart Notification fields to disable or n before pressing
Enter
555-233-115
Enter.
.
to check the health of the SPE.
Enter
Issue 7 November 2003
.
Enter
4-15