Avaya DEFINITY Server R Manual page 248

Upgrades and additions
Hide thumbs Also See for DEFINITY Server R:
Table of Contents

Advertisement

Upgrading a Multicarrier G2 Universal Module to Avaya
DEFINITY Server R EPN running Avaya Communication
Manager
Retranslate Port Circuits
If port circuit packs in the G2 module control carrier were relocated in order to put:
A critical port circuit pack, requiring longer nominal battery holdover (such
as a DS1 or an Announcement circuit pack), in a port slot
A TN736, TN752, or TN755 power supply in port slots "18" and "19"
A TN776 or TN570 Expansion Interface in port slot "1"
A TN776 or TN570 in port slot "2" (for a second directly connected EPN)
of the new expansion control carrier, verify that they were retranslated during the
off-site software upgrade. If not, they must be retranslated now. Refer to
Administrator's Guide for Avaya Communication Manager for instructions on
performing the retranslations.
Check Link Status
1. Type display communication-interface links and press
with the earlier status.
2. Type status link number and press
Enable Scheduled Maintenance
Type change system-parameters maintenance and press
scheduled daily maintenance.
Resolve Alarms
Examine the alarm log and resolve any alarms.
Enable Alarm Origination to INADS
1. Get the DOSS order number of the upgrade from the project manager and
ask the regional Customer Software Administration to complete the
Customer Options
-xiii
for telephone numbers.
NOTE:
As part of the system registration process, the INADS Database
Administrator enables Alarm Origination and customer options.
5-58
Issue 7 November 2003
. Repeat this step for each link.
Enter
steps. See
''How to get technical assistance'' on page
. Compare it
Enter
. Enable the
Enter
Check
555-233-115

Advertisement

Table of Contents
loading

Table of Contents