Avaya DEFINITY Server R Manual page 168

Upgrades and additions
Hide thumbs Also See for DEFINITY Server R:
Table of Contents

Advertisement

Upgrading R5si/R6si to an Avaya DEFINITY Server R
EPN running Avaya Communication Manager
2. Behind control cabinet A of EPN stack 2:
a. Install a lightwave transceiver on the connector at slot 2A01.
b. Connect a fiber optic cable to the transceiver just installed.
c. Route the cable down the outside of the rear covers and through the
d. Connect the fiber optic cable to the lightguide interface unit.
e. Carefully attach the fiber optic cable (with cable ties) to the rear
f. Coil up the surplus fiber optic cable and place the coil in the cable
Figure Notes
1. Lightwave Transceiver
2. PPN Carrier B Slot 1B02
3. EPN 1 Carrier A Slot 2A01 (Cabinet
Stack 2)
4. Fiber Optic Cable
Figure 4-11. Fiber Optic Connections PPN to EPN1
4-44
Issue 7 November 2003
cable manager to the PDS cross-connect facility.
covers of the EPN stack.
manager.
RX TX
2
1
1
2
2
1
1
2
2
5. Fiber Optic Cross-Connect Facility
6. Lightguide Interface Unit (LIU)
7. TX Connector
8. RX Connector
1
cydf013 CJL102396
555-233-115

Advertisement

Table of Contents
loading

Table of Contents