Avaya DEFINITY Server R Manual page 173

Upgrades and additions
Hide thumbs Also See for DEFINITY Server R:
Table of Contents

Advertisement

Interconnect Port Networks with Fiber Optic Cabling
For 1 or 2 Fiber-Remoted Expansion Port Networks
1. Behind port carrier C of the multicarrier PPN. See
4-13:
a. Install a lightwave transceiver on the connector at slot 1C02.
b. Connect a fiber optic cable to the transceiver just installed.
c. Route the fiber cable to the cabinet cable tray and out of the cabinet
d. Connect the fiber cable to the lightguide interface unit provided.
e. Carefully attach the fiber optic cable (with cable ties) to the wall of
2. Behind control cabinet A of EPN stack 2:
a. Install a lightwave transceiver on the connector at slot 2A01.
b. Connect a fiber cable to the transceiver just installed.
c. Route the fiber cable down the outside of the rear covers and
d. Connect the fiber cable to the lightguide interface unit provided.
e. Carefully attach the fiber optic cable (with cable ties) to the rear
f. Coil the surplus fiber optic cable and place it in the cable manager.
555-233-115
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
through the cable manager to the PDS cross-connect facility.
the cable tray at the built-in cable tie positions.
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
through the cable manager to the PDS cross-connect facility.
covers of the EPN stack.
Figure 4-12
and
Issue 7 November 2003
Figure
4-49

Advertisement

Table of Contents
loading

Table of Contents