Upgrading a Multicarrier G2 Universal Module to Avaya
DEFINITY Server R EPN running Avaya Communication
Manager
Remove Carrier Ground Straps
1. Disconnect the top and bottom ground straps from the "A" carrier. See
Figure
Figure Notes
1. Rear of Cabinet
2. Port Carrier ("C" Position)
3. Ground Jumpers
Figure 5-2. Location of Ground Jumpers
5-24
Issue 7 November 2003
5-2. These straps will reconnect to the new "A" carrier.
4. Module Control Carrier ("A"
Position)
5. Port Carrier ("D" Position)
555-233-115
Need help?
Do you have a question about the DEFINITY Server R and is the answer not in the manual?