Upgrading R5si/R6si to an Avaya DEFINITY Server R
EPN running Avaya Communication Manager
For 1 to 15 High Reliability EPNs.
1. Behind the PPN cabinet. See
a. Install a lightwave transceiver on cable connector at slot 1E02.
b. Install a lightwave transceiver on cable connector at slot 1C02.
c. Connect 1 end of the metallic intercarrier cable to the lightwave
d. Route the intercarrier cable from the lightwave transceiver to the
e. Connect the other end of the intercarrier cable to the lightwave
f. Install a lightwave transceiver on cable connector at slot 1E20.
g. Install a lightwave transceiver on cable connector at slot 1D02.
h. Connect 1 end of the metallic intercarrier cable to the lightwave
i. Route the intercarrier cable from the lightwave transceiver to the
j. Connect the other end of the intercarrier cable to the lightwave
k. Attach the intercarrier cables (with cable ties) to the wall of the cable
2. Behind switch node carrier E of PPN cabinet 1. See
a. For each EPN, install 1 lightwave transceiver on a cable connector
b. Connect 1 end of each fiber optic cable to each lightwave
c. Carefully attach the fiber optic cables (with cable ties) to the wall of
d. Behind control cabinet A of each single-carrier EPN:
e. Install the same kind of lightwave transceiver on cable connector at
f. Connect the other end of the fiber optic cable to the lightwave
g. Coil the surplus length of fiber optic cable, and place the coil either
4-58
Issue 7 November 2003
Figure
transceiver at slot 1E02.
cabinet's cable tray and upward to carrier "C."
transceiver at slot 1C02.
transceiver at slot 1E20.
cabinet's cable tray and upward to carrier "D."
transceiver at slot 1D02.
tray at the built-in cable tie positions.
with the following order of slots: 1E03, 1E19, 1E04, 1E18, 1E05,
1E17, and so forth.
transceiver, just installed.
the cable tray at the built-in cable-tie positions.
slot A01.
transceiver, just installed, at slot A01.
in the cable manager or on the bottom shelf (holding the power
supply) of the PPN cabinet.