Figure 3-131 Install The Fan Access Panel; Figure 3-132 Removing Chsg Large Batt Box Cover - NEC Univerge SV9100 System Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

Issue 3.0
SV9100 System Hardware Manual
6.
Insert the access panel tab into the rear of the CHS2UG-US chassis
running the Battery Connection Cable through the cutout. Secure
panel with the retaining screw.

Figure 3-131 Install the Fan Access Panel

7.
Connect grounding and AC power cables.
8.
Apply power to chassis (refer to Chapter 4,
SV9100 System on page
8.2.4
CHSG LARGE BATT BOX Fuse Replacement
1.
Loosen screw on front of CHSG LARGE BATT BOX.

Figure 3-132 Removing CHSG LARGE BATT BOX Cover

2.6 Powering Up the
4-9).
3-101

Advertisement

Table of Contents
loading

Table of Contents