Connect The Controlling And Expansion Chassis; Figure 3-20 19" Expansion Chassis Interface Units - NEC Univerge SV9100 System Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

Issue 3.0
SV9100 System Hardware Manual
3.3.2.4

Connect the Controlling and Expansion Chassis

CAUTION

Figure 3-20 19" Expansion Chassis Interface Units

Expansion Chassis Interface Unit
for the Expansion Chassis
GPZ-BS11
Expansion Chassis Interface Unit
for the Controlling Chassis
GPZ-BS10
1.
2.
Installment of the GPZ-BS10 blade and
GPZ-BS11 blade(s) must be completed prior to
installation of the provided (CAT 5) expansion
cabling
Ensure Controlling and Expansion chassis are powered
down.
Using the NEC provided CAT5 straight-through cable(s),
attach one end to each Expansion Chassis CN2 connector
on the GPZ-BS11 blade (see
Cabling on page
3-18). Attach the opposite end to the CN2,
CN3 or CN4 connector on the GPZ-BS10 of the Controlling
Chassis.
Figure 3-21 System Expansion
3-17

Advertisement

Table of Contents
loading

Table of Contents