NEC Univerge SV9100 System Hardware Manual page 316

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

4-66
The BRI blade provides:
Two (GCD-2BRIA) 2-Channel Circuits (2B + D) configured as T-Bus
64Kb/s Clear B-Channel and 16Kb/s D-Channel
Two Status LEDs
Connector for GPZ-2BRIA
These trunk circuits can be connected to either ISDN trunks or ISDN
telephones, depending on the switch setting in system programming. All
ISDN telephone circuits (#1-2 and #3-4 with the BRI daughter board) are
supplied DC power from the system.
The BRI Interface blade uses a single universal slot. Each blade connects
to the network via an NTI Network Termination.
To block new calls on the blade, system programming must be used. This
program prevents new calls from being established on the blade, but it does
not terminate any existing call.
With the maximum number of blades installed, the following can be
provided:
The 2BRI provides 30 BRI circuits and 60 BRI channels.
(Port Consumption: T-Bus=4 ports)
Refer to the following tables for maximum upgrade capacities of the
GCD-2BRIA blade:
Table 2-6 SV9100 Maximum 9.5" Gateway and 19" System
Capacities – Blades on page 2-12
Table 2-7 SV9100 Maximum 9.5" Base and Expansion System
Capacities – Blades on page 2-14
5.3.2
Installation
To install the GCD-2BRIA
1.
Plug the GCD-2BRIA blade into the system chassis.
2.
Before proceeding to Step 3, wait to verify that the STATUS LED
starts to flash. (Refer to
for the location of the LEDs on the blade.)
NOTE
:
Figure 4-23 GCD-2BRIA Blade on page 4-65
With normal operation, the status LED flashes fast.
If trouble was found during the self diagnostics
routine, the status LED flashes slow.
Once connected, the PKG LED will not be indicated
for the status of Layer 1 Link.
Issue 3.0
Installing the SV9100 Blades

Advertisement

Table of Contents
loading

Table of Contents