Figure 3-149 9.5" Chassis (Rear View) - NEC Univerge SV9100 System Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

3-112
8.4.2
CHSG LARGE BATT BOX to 9.5" Gateway (CHS2UG GW-US) or
Base (CHS2UG B-US) Chassis Connection
1.
Power down the CHS2UG GW-US or CHS2UG B-US chassis.
WARNING
2.
Disconnect AC power cable from rear of chassis.
3.
From the back of the 9.5" chassis, remove the black plastic square
covering the two-prong battery terminal leads (refer to
9.5" Chassis (Rear

Figure 3-149 9.5" Chassis (Rear View)

For External Battery
(12V Connection)
4.
Connect one end of Battery Connection Cable to Battery Connector
on rear of 9.5" chassis.
5.
Connect other end of cable to Battery Connector on rear of CHSG
LARGE BATT BOX chassis (refer to
BATT BOX to CHS2UG GW-US or CHS2UG B-US Connection on
page
3-113).
Ensure the CHS2UG GW-US or CHS2UG B-US chassis
is powered OFF.
View)).
Ground
Figure 3-150 CHSG LARGE
Issue 3.0
Figure 3-149
CHS2UG
AC Inlet
Installing the SV9100 Chassis

Advertisement

Table of Contents
loading

Table of Contents