NEC Univerge SV9100 System Hardware Manual page 13

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

Section 6
Stand Mounting the Chassis................................................................. 3-72
6.1
6.2
Section 7
Rack Mounting the Chassis .................................................................. 3-82
7.1
7.2
Section 8
Battery Connection ................................................................................ 3-87
8.1
8.2
8.3
8.4
Section 9
Power Supply ....................................................................................... 3-113
Section 10 Remove and Install Cooling Fan......................................................... 3-114
10.1
System Hardware Manual
Stand Mounting the 19" (CHS2UG-US) Chassis........................... 3-72
6.1.1
CHS2UG-US Chassis Installation................................................ 3-72
6.1.2 Multiple CHS2UG-US Chassis Installation .................................. 3-75
Stand Mounting the 9.5" CHS2UG B Chassis............................... 3-78
Rack Mounting the 19" (CHS2UG-US) Chassis ............................ 3-82
Rack Mounting the 9.5" Base (CHS2UG B-US) and Expansion
(CHS2UG E) Chassis.................................................................... 3-84
Installing the Internal Batteries 19" (CHS2UG-US) Chassis ......... 3-87
Installing the External Batteries 19" (CHS2UG-US) Chassis ........ 3-92
8.2.1
Floor Mounting the CHSG LARGE BATT BOX............................ 3-93
8.2.2 Battery Installation ....................................................................... 3-94
8.2.3 CHSG LARGE BATT BOX to CHS2UG-US Connection ............. 3-98
8.2.4 CHSG LARGE BATT BOX Fuse Replacement ......................... 3-101
Installing the CHS2UG B SMALL BATT BOX on the
9.5" CHS2UG B Chassis ............................................................. 3-104
8.3.1
CHS2UG B SMALL BATT BOX Installation............................... 3-104
8.3.2 CHS2UG B SMALL BATT BOX Fuse Replacement.................. 3-110
Installing the External Batteries (CHSG LARGE BATT BOX)
to the 9.5" Gateway (CHS2UG GW-US) or Base
(CHS2UG B-US) Chassis............................................................ 3-111
8.4.1 CHSG LARGE BATT BOX Installation ...................................... 3-111
8.4.2 CHSG LARGE BATT BOX to 9.5" Gateway
(CHS2UG GW-US) or Base (CHS2UG B-US)
Chassis Connection ................................................................... 3-112
8.4.3 CHSG LARGE BATT BOX Fuse Replacement ......................... 3-113
CHS2UG-US Chassis ................................................................. 3-114
10.1.1 Remove Cooling Fan ................................................................. 3-114
Issue 3.0
v

Advertisement

Table of Contents
loading

Table of Contents