Installing the SV9100 Chassis
S
1
G
ECTION
ENERAL
This chapter contains information to help the technician install the chassis for the
SV9100 system. The technician should be familiar with this section before installing
any equipment.
S
2
S
ECTION
ITE
Pre-installation planning is essential. Advanced planning minimizes installation time,
cost, and disruption of the customer business activities.
2.1
SV9100 System Hardware Manual
I
NFORMATION
P
REPARATION AND

Precautionary Information

Observe the following warnings during installation.
WARNING
Never install telephone wiring during a lightning storm.
Never install telephone jacks in wet locations unless the jack is specifically
designed for wet locations.
Never touch uninsulated telephone wires or terminals unless the telephone line
is disconnected at the network interface.
Use caution when installing or modifying telephone lines.
To avoid shock or equipment damage, do not plug in or turn the system power
on before completing the installation process.
Avoid working with the equipment during electrical storms.
Use only commercial AC power to prevent shock or fire.
Use the power cord supplied for the chassis.
To prevent overheating, do not bundle AC power cords together.
Make sure the chassis has a proper earth ground.
Install batteries with the correct polarity to prevent damaging equipment.
To avoid damage, the chassis should not be placed on unstable surfaces.
MDF/IDF C
ONSTRUCTION
:
UNIVERGE
®
SV9100
Chapter 3
3-1