Figure 7-18 Install Ap20 Base Station; Table 7-8 Base Station Led States And Meanings - NEC Univerge SV9100 System Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

Issue 3.0
SV9100 System Hardware Manual
Install the Base Station
1.
Connect a standard Ethernet cable (Cat 5 or higher) to the Ethernet/PoE
jack on the rear of the base station.
2.
Route the cable through the channel.

Figure 7-18 Install AP20 Base Station

3.
Connect the other end of the cable to your TCP/IP network.
When the base station powers on, the STATUS LED on the front briefly
lights orange and then turns off while it initializes and connects to the
network. After the base station successfully initializes and connects to the
network, the LED lights green and remains steady on (refer to
Base Station LED States and

Table 7-8 Base Station LED States and Meanings

Color
State
Green
Flickering
Green
Steady On All operations normal.
N/A
Orange
Briefly On
Orange
Flickering
Meanings).
Stage in base flash memory rewrite at the end of the
base firmware update.
Off
No power in unit
OR
initializing and connecting to the network.
Powering on.
Stage in base flash memory rewrite at the end of the
base firmware update.
Table 7-8
Meaning
7-19

Advertisement

Table of Contents
loading

Table of Contents