NEC Univerge SV9100 System Hardware Manual page 251

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

Installing the SV9100 Blades
S
1
G
ECTION
ENERAL
This chapter contains information to help the technician install the blades for the
UNIVERGE SV9100 system. The technician should be familiar with this section
before installing any equipment.
1.1
SV9100 System Hardware Manual
I
NFORMATION
Slot Locations
Each CHS2UG-US has six slots. In the Controlling Chassis, the GCD-CP10 (for
Key Systems) must be installed in the first slot (slot 1). In the CHS2UG GW-US
and CHS2UG B-US, the GCD-CP10 must be installed in the first slot (slot 1).
Slot Locations in the CHS2UG-US (19" Controlling Chassis):
Slot 1 – dedicated for the CPU
Slots 2~6 – universal
Slot Locating in the CHS2UG-US (19" Expansion Chassis):
Slots 1~6 are universal. (i.e., any type of blade except the CPU can be installed
in these slots).
Slot Locations in the CHS2UG GW-US and CHS2UG B-US Base (9.5" Chassis):
Slot 1 – CPU
Slots 2 and 3 – universal
Slot Locations in the 9.5" CHS2UG B-US and CHS2UG E (Controlling Chassis
with CPU):
Slot 1 – CPU
Slots 2~6 – universal
Slot Locations in the 9.5" CHS2UG B-US and CHS2UG E (Expansion Chassis no
CPU):
Slots 1~6 – universal
UNIVERGE
®
SV9100
Chapter 4
4-1

Advertisement

Table of Contents
loading

Table of Contents