4-110
Video: VGA - Maximum of 2048x1536 resolution
LAN: Two 10Base-T/100Base-TX/1000Base-T Ethernet RJ45 ports
USB: Four USB 2.0 ports
Shutdown Button: This is a momentary push button switch for a
graceful shutdown of the GCD-SVR2. (It is also used for restarting the
GCD-SVR2).
LEDs: Four Front Panel indicators
- Power LED
- Application1 LED
- Application2 LED
- SSD Active LED
Power: 6W maximum
For maximum upgrade capacities of the
Table 2-6 SV9100 Maximum 9.5" Gateway and 19" System
Capacities – Blades on page 2-12
9.5" Base and Expansion System Capacities – Blades on page
6.6.2
Installation
A maximum of three
IMPORTANT
Wear a grounding strap while handling the
1.
Install the
2.
6.6.3
LED Indications
6.6.3.1
Power LED
Power LED Indicates power is present.
6.6.3.2
Application1 and Application 2 LEDs
Application1 and 2 LEDs are for use by the Application. Each
Application (UCB, Desktop Suite, etc.) defines their use and
meaning.
6.6.3.3
SSD Active LED
SSD Active LED Indicates activity (read/write) on the solid state
drive (SSD).
6.6.4
Connectors
The following sections provide detail on each user interface.
and
s can be installed per chassis.
GCD-SVR2
This unit makes extensive use of CMOS technology and is very
susceptible to static; extreme care must be taken to avoid static
discharge when handling.
into a slot in the chassis.
GCD-SVR2
Issue 3.0
blade, refer to
GCD-SVR2
Table 2-7 SV9100 Maximum
.
GCD-SVR2
Installing the SV9100 Blades
2-14.