Installation
Install the option board to the option board
holder. Make sure that the option board is
securely fastened.
6
Cut free a sufficiently wide opening for the
option board connector.
7
Attach the option board cover to V20. Attach
the strain relief cable clamp with screws if
needed.
8
Local contacts: https://www.danfoss.com/en/contact-us/contacts-list/
vacon • 33
11559A_00
11650_00
11560A_00
5
Need help?
Do you have a question about the optea and is the answer not in the manual?
Questions and answers