Connecting Workpoint Clients; Making Trunk Connections; Performing A Visual Inspection - Siemens HiPath 3000 Service Manual

Hide thumbs Also See for HiPath 3000:
Table of Contents

Advertisement

inst_h3.fm
Installing HiPath 3000
Installing HiPath 3550, HiPath 3350, HiPath 3500, and HiPath 3300
4.4.4.10

Connecting Workpoint Clients

For information, see Chapter 10.
4.4.4.11

Making trunk connections

Refer to the following board descriptions for information:
STLS4R (S
trunk connection)
0
TS2R, only HiPath 3500 (S
TLA4R (Not for U.S.) (MSI)
TMGL4R (for U.S. only)
TST1 (for U.S. only), HiPath 3500 only
4.4.4.12

Performing a Visual Inspection

Before starting up the system, you must perform a visual inspection of the hardware, cables,
and the power supply. The visual inspection must be performed while the system is disconnect-
ed from the power supply.
Caution
7
Conduct the visual inspection only while the system is disconnected from the power
supply.
Always wear an antistatic wristband and observe the measures for protecting elec-
trostatically sensitive devices (see Page 1-9).
Step
1.
Compare the slots for the
installed boards with the
board assignment map.
2.
Check the local line voltage. Digital multimeter
After finishing the visual inspection, you can begin starting up the system as de-
>
scribed in Chapter 5.
4-198
trunk connection)
2M
Activity
Board assignment map
Resources/Remarks
P31003-H3550-S403-4-7620, 02/05
HiPath 3000 V5.0, HiPath 5000 V5.0, Service Manual
Possible remedies
Correct the board
configuration and no-
tify the sales depart-
ment.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hipath 5000

Table of Contents