Options for supplying power to the base stations
For information on connecting the base stations, refer to the HiPath Cordless Office
>
service manual.
Each base station must be connected to the SLC16 or SLC16N via the main distribution frame
(MDFU or MDFU-E).
Always route the U
surges due to lightning will be arrested. To do so, insert the polarized surge protectors (sup-
plied) in the plugging locations on the splitting strip from above.
The following options are available for supplying power to the base stations:
Power supply via one U
Power supply via two U
Power supply via three U
If the power supplied by the UPSC-D (HiPath 3550) is insufficient, additional power can be sup-
plied by installing the external power supply EPSU2 (Page 3-150).
Signal propagation times differ due to the varying distances between the base stations, the sys-
tem, and the connection cables used (refer to the HiPath Cordless Office service manual). The
SLC16 and SLC16N boards automatically balance these propagation times.
P31003-H3550-S403-4-7620, 02/05
HiPath 3000 V5.0, HiPath 5000 V5.0, Service Manual
interfaces on the SLC16 or SLC16N via a splitting strip to ensure that
P0/E
interface (Page 3-148)
P0/E
interfaces (Page 3-149)
P0/E
interfaces (Page 3-150), for BS3/3 only
P0/E
boards.fm
Boards for HiPath 3000
Peripheral Boards