Figure 9-17 Flowchart For Cdb Conversion From V4.0 -> V5.0 (Part 2 Of 4) - Siemens HiPath 3000 Service Manual

Hide thumbs Also See for HiPath 3000:
Table of Contents

Advertisement

Open "HXG Configuration" dialog.
For all HG 1500 boards installed:
Delete all system clients.
Delete all HFA clients in the S
Delete all vCAPI clients in the S
Check whether the number of all
configured stations and lines is 0.
Figure 9-17
Flowchart for CDB Conversion from V4.0 –> V5.0 (Part 2 of 4)
P31003-H3550-S403-4-7620, 02/05
HiPath 3000 V5.0, HiPath 5000 V5.0, Service Manual
Delete all lines.
0
station.
station.
Expanding and Upgrading HiPath 3000
Open "HXG Configuration" dialog.
Delete all S
Convert CDB from V4.0 –> V5.0
using HiPath 3000 Manager E.
Set "Release gateway resources"
Configure S
0
V5.0 conversion complete.
Upgrading HiPath 3000 to V5.0
stations.
0
flag.
stations.
0
Save CDB.
exup.fm
9-33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hipath 5000

Table of Contents