Siemens HiPath 3000 Service Manual page 228

Hide thumbs Also See for HiPath 3000:
Table of Contents

Advertisement

boards.fm
Boards for HiPath 3000
Peripheral Boards
System configuration using SLCN
For information on the maximum possible system configuration of HiPath Cordless Office with
the SLCN boards see Table 11-1.
SLCN board distribution in HiPath 3800 cabinets
You can install up to four SLCN boards in HiPath 3800. A system cabinet can be fitted with all
four SLCN boards.
To guarantee uninterrupted operation of the HiPath 3800, not more than two SLCN
>
boards should be plugged in to a PCM segment. This condition must always be ob-
served. For information on PCM segment distribution, see Section 4.2.5.6.
One board slot should be kept free between two SCLN boards to prevent overheat-
ing.
Supplying power to base stations
Power is supplied to the base stations primarily via the internal PSU in the system in question.
If the correct number of LUNA2 modules was calculated, the system's internal power supply
unit provides sufficient power to supply the HiPath Cordless Office system configuration spec-
ified in Table 11-1.
3-162
P31003-H3550-S403-4-7620, 02/05
HiPath 3000 V5.0, HiPath 5000 V5.0, Service Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hipath 5000

Table of Contents