Figure 4-51 Hipath 3750 - Installing A Two-Cabinet System (Stacked) - Siemens HiPath 3000 Service Manual

Hide thumbs Also See for HiPath 3000:
Table of Contents

Advertisement

inst_h3.fm
Installing HiPath 3000
Installing HiPath 3750, HiPath 3700
Installing a two-cabinet system
EC1
BC
Figure 4-51
HiPath 3750 - Installing a Two-Cabinet System (Stacked)
Laying the Connecting Cables
To lay the connecting cables between the two cabinets, you can cut out the pre-stamped re-
cesses in the bottom of EC1 and the top of the BC with a pair of diagonal cutting pliers and
break them out with a pair of flat-nosed pliers.
Caution
7
Be careful when breaking out the recesses. Remove any sharp edges and corners.
4-96
EC1
BC
Washers
HiPath 3000 V5.0, HiPath 5000 V5.0, Service Manual
Inside
the cabinet
P31003-H3550-S403-4-7620, 02/05

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hipath 5000

Table of Contents