14.3.1.4 Software configuration

The UFM delivery set includes the "Recovery Tool CD" to setup the ESXi
configuration. Proceed as follows:
Ê Switch on the server.
Ê Right after switching on the server, insert the "Recovery Tool CD" into the
DVD drive and close the drive tray.
Ê The server should now boot from the "Recovery Tool CD".
Ê Follow the on-screen instructions.

14.3.2 Removing the UFM

Field Replaceable Unit
(FRU)
Tools: – Phillips PH1 / (+) No. 1 screw driver
– combination pliers and flat nose pliers

14.3.2.1 Preliminary steps

"Disabling SVOM boot watchdog functionality" on page 64
Ê
"Suspending BitLocker functionality" on page 63
Ê
"Shutting down the server" on page 45
Ê
"Disconnecting the server from the mains" on page 46
Ê
"Getting access to the component" on page 47
Ê
Ê Remove the riser module 3 as described in section
module" on page
256
58.
Upgrade and Maintenance Manual
Hardware: 5 minutes
"Removing a riser
RX1330 M1