Hobart 9OC24S Operation Manual page 266

Self-propelled generator set
Table of Contents

Advertisement

FOBART
:
t
QQ
iMOTOR
GENERATOR
DIVISION
a
HOBART
BROTHERS
C0MPP.N"
"0
2
% . B ,8
OPERATION,
MAINTENANCE,
AND
OVERHAUL
MANUAL,
TM-240A
SELF-PROPELLED
GENERATOR
SET,
SPEC.
NO.
5381A
(5)
Remove nuts (8) and washers and lift
off power module panel assembly.
B.
Installation
(1
(2
(3)
(4)
(5)
(6)
Position
the power module panel assembly on the four mounting
studs,
and
attach with two washers and nuts (8) on left
side.
Be sure capacitor
(11) leads are connected
to terminals
(lo),
and place
generator
lead terminals
on studs (10).
Position
cable clamps (3) on pane I
mounting
studs and secure with
panel mounting
nuts.
Install
nuts (1).
Connect
leads (6) to terminal
board (7).
Refer to connection
diagram in 5-l
if necessary.
Connect
output cables (5) to load contactor
(9).
Check all attaching
parts for security.
Install
cover (4) with two attaching
screws.
4.
Control
Box
A.
Removal
The control
box and rear canopy are removable
as an assembly.
It is unlikely
that
the box will
be removed except
to accomplish
engine-generator
removal.
Remove the box assembly
in accordance
with applicable
portions
of 4-1,
Para.
2,
B.
B.
lnstal lation
Install
the control
box assembly
in accordance
with applicable
portions
of 4-1,
Para.
3,
B.
4-2
Page 4

Advertisement

Table of Contents
loading

Table of Contents