Configuring the RLC
If you test QoS transition by disconnecting the Ethernet cable from the Remote
Gateway 9100 Series unit, or RLC, expect up to a 20-second delay before the
Remote Gateway 9100 Series unit can place or receive a call. You do not
encounter this delay when the network degrades and calls switch to BRI as
designed.
If a QoS transition occurs while a Remote Gateway 9100 Series unit is sending
or receiving a fax, the packets lost prior to the transition can result in:
a fax that is not readable at the receiving end
error messages that appear on both the sending and receiving fax machines
If this occurs, send the fax again.
More information
Refer to the Remote Gateway 9100 Series Network Engineering Guidelines
(NTP 555-8421-103) for detailed information describing QoS Transitioning
Technology. To locate this document, click on the Technical Documentation
link at the following website:
www.nortel.com
Getting there
Quality of Service dialog box
212
→
RLC
Configuration Manager
→
Quality of Service
→
Remote Connection Configuration
RLC Installation and Administration Guide
Standard 4.0