Planning for RLC installation
RLC Installation Checklist
Page 7 of 7
✔
Task
7. Testing
❒
PING the RLC to ensure that it is
recognized as a device on the
network.
❒
Ensure that calls can be made and
received on each RLC port.
8. Administration
❒
Plan for administration training and
technical support.
Note: The RLC and Configuration Manager software are Year 2000 compliant.
58
For details, refer to
"Testing the connections".
"Testing the connections".
Chapter 7, "Administration"
Chapter 8,
"Troubleshooting"
RLC Installation and Administration Guide
Standard 4.0