Honda VT750C2 Shadow Spirit Service Manual page 269

2007-2009 motorcycle
Hide thumbs Also See for VT750C2 Shadow Spirit:
Table of Contents

Advertisement

- -
CRANKSHAFTITRANSMISSIOI\l
BUSHINGS
Check the bushings for wear or damage.
Measure the 0.0. of each bushing.
SERVICE LIMITS:
M3, M5, gear bushings: 27.94 mm (1.100 in)
C1, C4 gear bushings:
30.93 mm (1.218 in)
C2 gear bushing:
23.94 mm (0.943 in)
Measure the 1.0. of each bushing.
SERVICE LIMITS:
M3gearbushing: 25.04 mm (0.986 in)
C2 gear bushing: 20.04 mm (0.789 in)
MAINSHAFTICOUNTERSHAFT
Check the spline grooves and sliding surfaces for
abnormal wear or damage.
Measljretl1e 0,0. of the mainshaft and countershaft
at the gear and bushing sliding areas.
SERVICE LIMiTS:
Mainshaft (at M3 gear bushing):
24.94 mm (0.982 in)
Cauntershaft (at C2 gear bushing):
19.96 mm (0.786 in)
Calculate the gear-to-bushing and bushing-to-shaft
clearance.
SERVICE LIMITS:
Gear-ta-bushing
M3, M5, C2:
0.10 mm (0.004 in)
C1, C4:
0.11 mm (0.004 in)
Bushing-ta-shaft •
M3:
0.10 mm (0.004 in)
C2:
0.07 mm (0.003 in)
SHIfT FORK
Check foro deformation or abnormal wear.
Measure};the shift fork claw thickness.
~~
SERVICE'L1MIT: 5.6 mm (0.22 in)
Measure the shift fork 1.0.
SERVICE LIMIT: 13.03 mm (0.513 in)
t
C2
13-22
_ _ _ _ 0
_

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents