FRONT WHEEL/SUSPENSION/STEERING
INSTALLA
TION
NOTE:
• Route the cable, hose and wires properly
(page 1-22).
Check the bushings for abnormal wear or damage.
BUSHINGS
Install the setting rubbers onto the top bridge with
its small 1.0. side facing up as shown.
Install the' handlebar lower holders, washers and
nuts onto the top bridge.
Place the handlebar on the lower holders aligning
the punch mark on the handlebar with the top sur
face of the lower holders.
Install the upper holders with its punch mark facing
forward.
Tighten the front side bolts first, then the rear side
bolts to the specified torque.
TORQUE: 23 N·m
(2.3
kgf·m, 17 IbHt)
LOWER HOLDERS
UPPER HOLDERS
15-9