1A–18 HEATING, VENTILATION AND AIR CONDITIONING (HVAC)
Installation
To install, follow the removal steps in the reverse order,
noting the following points:
Blower Assembly and Associated Parts
Legend
(1) Instrument Panel Assembly
(2) Blower Assembly
Removal
1. Disconnect the battery ground cable.
2. Discharge
and
recover
conditioning).
f Refer to Refrigerant Recovery in this section.
Blower Assembly
refrigerant
(with
air
1. Apply grease to the sub-lever and to the abrasive
surface of the heater unit.
2. After installing the link unit, check to see if the link unit
operates correctly.
(3) Evaporator Assembly (A/C only)
(4) Duct
(5) Heater Unit
3. Remove instrument panel assembly.
f Refer to Instrument Panel Assembly in Body and
Accessories section.
4. Disconnect resistor connector.
5. Remove duct.
873RW004