f Install the rubber bushing by using to installer
J–xxxxx.
NOTE: When mounting rubber bushings, be sure not to
use grease on bushings or any other nearby part.
Installation
1. Install upper link. Make sure that the upper link is in its
correct position.
NOTE: When mounting upper link, be sure not to use
grease bushings or any other nearby part.
2. Install bolt, nut, rubber plate and protector. Tighten
the bolts and nuts lightly, then retighten them to the
specified torque after the vehicle is at curb height.
Torque: 137 N·m (101 lb ft)
3. Install speed sensor cable.
4. Install fuel tank.
901RW157
460RW012
REAR SUSPENSION
3D–11