K&R GT600-4T132G User Manual page 38

Ac drive high performance open and closed loop
Table of Contents

Advertisement

2. Mechanical Installation
Prepare and install the bottom mounting bracket and guide rail.
2
- 36 -
Take the bottom mounting bracket out and install it at the bottom of the nine-folding AL
cabinet. If a non-nine-folding AL cabinet is used, drill mounting holes for the mounting bracket
on site.
Figure 2-17 Installing the bottom mounting bracket
Assemble the guide rail (model: GT600-AZJ-A3T10, optional).
Figure 2-18 Assemble the guide rail
Right rail
M5 x 12 combined
screws (8PCS)
Left rail
Connecting plate (above)
Connect the guide rail to the bottom mounting bracket, and fix them with two M6 nuts.
Figure 2-19 Connect the guide rail to the bottom mounting bracket
Nine-folding AL cabinet
Bottom mounting bracket
(standard configuration)
M5 self-tapping screw
Quantity: 6 PCS
Connecting plate (below)
Bottom
mounting bracket
Cabinet
Guide rail
M6 nut (2PCS)

Advertisement

Table of Contents
loading

Table of Contents