K&R GT600-4T132G User Manual page 36

Ac drive high performance open and closed loop
Table of Contents

Advertisement

2. Mechanical Installation
There are three steps of installing the AC drive in cabinet.
Step 1: Get acquainted with cabinet layout.
Figure 2-14 Recommended cabinet layout of GT600-4T350G to GT600-4T450
2
- 34 -
Cabinet ventilation
top cover
Wind screen
Transformer (from
380 V to 220 V)
Breaker
Cabinet
2200 mm
Contactor
Cabinet input
copper bar
AC input reactor
100mm
The cabinet dimension is 2200 x 800 x 600 mm. The height 2200 mm includes
Note
the 200 mm cabinet ventilation top cover but does not include the 100 mm
cabinet base.
After push-in, remove the baffle on the top of the drive, preventing occurrence of
overcurrent because ventilation air cannot flow out.
Grounding
Output
terminal of GT600
copper bar
Ventilation
airflow of
GT600
Front door
GT600
(450 kW)
Front door
air inlet
Cabinet base

Advertisement

Table of Contents
loading

Table of Contents