Inspection Of Air Hoses (Foundry Prime) - ABB IRB 4600 Foundry Prime Product Manual

Table of Contents

Advertisement

3 Maintenance

3.4.13 Inspection of air hoses (Foundry Prime)

3.4.13 Inspection of air hoses (Foundry Prime)
General
The air hoses on Foundry Prime robots must be inspected for leakage every six
months.
Required equipment
Equipment, etc.
Leak detection spray
Pressure gauge
Cut off valve
Procedure
For this test it is recommended that the air supply to the robot has a pressure
gauge and a cut-off valve connected.
1
2
3
4
Continues on next page
148
Action
Apply compressed air to the air connector on
robot base, and raise the pressure with the
knob until the correct value is shown on the
pressure gauge.
Close the cut off valve.
The time is < 5 seconds:
If the answer is YES: Localize the
leakage by following the procedures
below.
If the answer is NO: The system is OK.
Remove the leak testing equipment.
Pressurize by opening the cut off valve.
© Copyright 2013-2018 ABB. All rights reserved.
Art. no.
-
-
-
Note
Recommended pressure:
0.2-0.3 bar
D
C
B
A
xx1500002399
A: Air connection robot
B: Pressure gauge
C: Cut off valve
D: Air connection
It should take at least 5 seconds for the
pressure to reach 0 bar.
Product manual - IRB 4600 Foundry Prime
3HAC040585-001 Revision: M

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents