Suspensions
THE FOLLOWING OPERATIONS APPLY WHEN
MOUNTING THE RIGHT HAND STEM
•
Observing the indicated sequence, ex-
tract and remove the dust guard (1),
the seeger ring (2), the oil seal (3), the
ring (4), the guide bushing (5) and the
slider bushing (6).
•
Insert the complete plunger (7).
•
Secure the stem in a vice and, after in-
serting the screw (8) used to fasten the
plunger, complete with the copper
washer (9), apply the pre-defined tight-
ening torque.
•
- Insert the stem in the sleeve.
SUSP - 304
SHIVER 900