Installation Verification - Huawei PowerCube 1000 Installation Manual

Table of Contents

Advertisement

PowerCube 1000 (STC, Saudi Arabia, ICC800-A1-C2,
ESC800-A1)
Installation Guide
After installing the cabinet and all equipment, check the installation items,
installation environment, and cables.
Checking the Cabinet Installation
Table 11-1 Cabinet installation checklist
No.
1
2
3
4
5
Checking the Environment
Table 11-2 Environment checklist
No.
1
2
Issue 02 (2021-09-28)
11
Check That
The cabinet is placed in accordance with the design
drawing.
The base is secured.
All bolts, especially the bolts used for electrical
connections, are fully tightened. Flat washers and
spring washers are all installed in correct sequence.
The cabinet is clean, free of dust and dirt.
All labels are correct, clear, and complete.
Check That
There are no unnecessary adhesive tape or cable
ties on cables.
There are no adhesive tapes, cable ties, paper
scraps, or packing materials around the cabinet.
Copyright © Huawei Technologies Co., Ltd.

Installation Verification

11 Installation Verification
Result
□ Yes □ No
□ Yes □ No
□ Yes □ No
□ Yes □ No
□ Yes □ No
Result
□ Yes □ No
□ Yes □ No
119

Advertisement

Table of Contents
loading

Table of Contents