Step 3 Remove the transparent cable protection panel from the power PDB busbar.
Step 4 Route the external input power cables into the power PDB through the cable holes at the
bottom, and route them out along the cable bridge above the cable holes.
Figure 9-2 Connecting input power cables for the power PDB
Step 5 Connect the cables by following the instructions in
After connecting the cables, seal the two cable holes at the bottom of the power PDB using
waterproof sealing putty.
Step 6 Reinstall the transparent cable protection panel, and close the door of the power PDB.
----End
9.2 (Optional) Connecting Generator Start/Stop Cables
(ATS Input)
Prerequisites
Pre-fab. modules and external cable trays have been installed.
Issue 03 (2020-06-09)
Copyright © Huawei Technologies Co., Ltd.
9 Installing Cables Outside Pre-fab. Modules
A.1 Cable Installation
Techniques.