51–44
44.
INSTALL FRONT SUSPENSION ARM SUB–ASSY LOWER NO.1 LH
45.
INSTALL FRONT SUSPENSION ARM SUB–ASSY LOWER NO.1 RH
HINT:
Perform the same procedure on the other side.
46.
INSTALL FRONT STABILIZER LINK ASSY LH
47.
INSTALL FRONT STABILIZER LINK ASSY RH
HINT:
Perform the same procedure on the other side.
RHD:
Fulcrum Length
SST(s)
LHD:
SST(s)
RHD:
Fulcrum Length
SST(s)
LHD:
SST(s)
AVENSIS REPAIR MANUAL (RM1018E)
POWER STEERING
48.
CONNECT PRESSURE FEED TUBE ASSY
(a)
Using SST(s), connect the pressure feed tube assy.
SST
Torque: 41 N m (414 kgf cm, 30 ft lbf)
HINT:
Y
Use a torque wrench with a fulcrum length of 345 mm
(13.58 in.).
Y
This torque value is effective when SST(s) is parallel to a
torque wrench.
Fulcrum Length
D29968
49.
CONNECT STEERING GEAR OUTLET RETURN TUBE
(a)
Using SST(s), connect the outlet return tube.
SST
Torque: 41 N m (414 kgf cm, 30 ft lbf)
HINT:
Y
Use a torque wrench with a fulcrum length of 345 mm
(13.58 in.).
Y
This torque value is effective when SST(s) is parallel to a
torque wrench.
(b)
LHD:
Fulcrum
Install the tube clamp with bolt to the power steering gear
Length
assy.
Torque: 8.0 N m (82 kgf cm, 71 in. lbf)
D29967
http://vnx.su
–
RACK & PINION POWER STEERING GEAR ASSY
(See page
30–6)
09023–12700
09023–12700
(See page
30–6)